Red brick, you can also use it like this

Red brick application patterns can turn a flat wall into relief, frame deep openings, form an open screen or carry one material language between outside and inside. The visible pattern is only the design starting point: it does not reveal whether the work is structural masonry, anchored veneer, adhered brick slips, a free-standing screen or a prefabricated panel.

This 2022 archive labels the subject “red brick,” but it gives no project names, locations, architects, completion dates, product records or photo credits. The four complete photographs below are therefore presented as unattributed external application references—not LOPO projects, product installations or proof of performance.

Visual intent
Relief depth, shadow, openness, privacy, view, daylight and transition mapped by elevation and occupied viewpoint
Unit identity
Manufacturer, exact product code, fired-clay status, full or thin unit, dimensions, finish, range and production lot
System route
Loadbearing masonry, anchored veneer, adhered slip, independent screen or panelised element selected before detailing
Actions
Self-weight, wind, seismic action where applicable, impact, eccentric projection, support movement and construction loads
Interfaces
Heads, sills, jambs, corners, floor edges, glazing, membranes, flashings, weeps, joints and terminations
Verification
Range board, coordinated details, calculations, full-scale visual mock-up, required tests and retained control sample

Pattern and structural bond are different decisions

A running, stacked, rotated, projecting or openwork arrangement describes what the face looks like. It does not tell the design team how individual units act together or connect to the supporting building. The Brick Industry Association’s Technical Note 30 makes the same useful distinction between pattern bond and structural bond for fired-clay brick masonry. The governing code and details may differ by jurisdiction and system.

Start with a dimensioned pattern drawing and a separate load path. Coordinate module, joint, cut units, corners and terminations with the real product tolerances. Where the design projects beyond the backing or leaves large openings, show how gravity and out-of-plane actions return to primary structure without relying on appearance or “typical” rules of thumb.

Low-angle view of a red masonry-like facade with deeply projecting zigzag relief
Complete 665 × 795 archive photograph, attachment 9425. It shows deep repeating relief and shadow from a low viewpoint; it does not identify the units, support, reinforcement, system or project.

1. Projecting relief: design the depth and the load path together

Relief can be developed by stepping courses, rotating units, using shaped elements, fixing thin units to a profiled backing or assembling repeated modules. Those routes may look similar from a distance but transfer self-weight, wind, seismic and impact actions differently. Select the route before setting the projection depth.

Geometry

Dimension the face plane, maximum and minimum projection, unit orientation, joint continuity, corner returns and what happens where the pattern meets a parapet, base or opening.

Support

Calculate eccentric loading and out-of-plane stability; document shelves, reinforcement, ties, anchors, backing or panel connections and their corrosion/exposure class.

Water and ledges

Map upward and horizontal faces that can collect rain, dust or snow. Coordinate drips, slopes, flashings, drainage and compatible joints without assuming the brick face is the water-control layer.

Access

Check installation sequence, temporary stability, tolerances, inspection and cleaning. Review accessible areas below projections and provide project-designed retention against falling pieces.

BIA Technical Note 36A is a fired-clay masonry reference for corbels and racking, but it cannot identify the pictured construction or validate another product/system. Project engineering and the selected manufacturer’s data remain decisive.

Red small-unit wall field surrounding deep grey projecting rectangular openings
Complete 665 × 770 archive photograph, attachment 9426. The image records a red small-unit surface and deep grey openings; it cannot establish whether the face is full brick, thin brick, tile or another unitised finish.

2. Deep openings: resolve the perimeter, not just the wall field

Openings interrupt support, movement and water-control layers. Draw head, sill and both jambs at the actual depth. Coordinate lintel or shelf support, flashing and end conditions, drainage outlets, window or louvre frames, air/water barriers, insulation continuity, sealant geometry, dissimilar-material movement and construction sequence.

BIA’s Technical Note 7 treats flashing at openings, projections and cladding transitions as part of wall-system water management. That principle is useful here, but dimensions and acceptance criteria must come from the governing project route. A photograph of a deep reveal cannot demonstrate watertightness, thermal continuity or serviceability.

Opening coordination record

  • Identify which trade owns the support, membrane, flashing, perimeter seal, drainage outlet and closure at every side.
  • Show the unit module and cut strategy at heads, sills and jambs, including corner pieces and tolerances.
  • Check differential movement between masonry or veneer, frame, backing and primary structure.
  • Mock up the full perimeter and test it when the project specification requires water, air or structural verification.
Red-orange open grid facade with vertical fins and windows visible behind
Complete 665 × 791 archive photograph, attachment 9427. It shows an external grid or screen-like layer in front of windows; the image does not reveal its product, openness calculation, anchors or environmental performance.

3. Openwork screen: define what the screen must and must not do

An openwork layer can edit views, light and shadow, but openings also admit wind, rain and debris. It is not automatically a weather wall, guard, ventilating system or solar-control device. Record the intended visual openness by elevation and viewpoint, then verify daylight, glare, shading, privacy or airflow with the appropriate project model or test.

Give the screen its own support and movement strategy. Define panel or bay limits, base and top restraint, intermediate support, ties/anchors, edge and corner conditions, interfaces at slabs and openings, tolerances, replacement access and inspection. If wall ties form part of a fired-clay masonry route, BIA Technical Note 44B illustrates why tie configuration, structural demand, detailing, installation and corrosion resistance must be specified together; it is not a pre-approved detail for this unidentified screen.

Open area

Schedule unit and joint geometry, net openings, view angles and privacy zones. Do not translate a face percentage directly into ventilation or energy savings.

Edges and occupied zones

Review exposed ends, climbability, reach, impact, guard requirements, objects passing through openings and people or property below under local rules.

Wind and movement

Calculate pressure on both units and support, including local edge/corner effects and pressure equalisation assumptions. Coordinate thermal, moisture and structural movement.

Inspection and replacement

Provide safe access to joints, ties, anchors and drainage; identify replaceable zones and retained spares rather than assuming hidden fixings remain observable.

Corridor beside a red-orange openwork screen, glazing and timber built-in furniture
Complete 665 × 793 archive photograph, attachment 9428. The corridor-like space visually pairs openwork units with glazing and interior finishes; its exact inside/outside boundary, project and construction are unverified.

4. Interior–exterior transition: separate the screen from the enclosure

A screen may continue the same red-unit rhythm into a sheltered corridor or sit beside a glazed enclosure. Establish which layer controls rain, air, vapour, condensation, acoustic separation, fire/smoke compartmentation and security. The visible openwork should not be assigned those duties unless the complete tested or assessed assembly actually carries them.

At floors and thresholds, coordinate drainage, level change, slip condition, clear route, glazing protection, cleaning and maintenance access. At occupied edges, review guard and opening requirements, climbability, impact and falling-object consequences for the actual users. These are code- and project-specific decisions; the photograph provides no compliant dimensions or rating.

Choose a system route before choosing a detail

Possible routeWhat it meansEvidence to require
Structural or self-supporting masonryUnits, mortar, reinforcement and supports form an engineered masonry elementUnit/mortar identity, geometry, calculations, reinforcement, foundations/supports, movement, exposure details, inspection and construction sequence
Anchored veneerA non-loadbearing masonry wythe transfers self-weight and lateral actions through supports and ties/anchors to backingBacking, cavities, shelves, ties/anchors, corrosion class, flashing/weeps, fire stopping, joints, tolerances and project structural design
Adhered brick slip or tileThin facing units rely on a compatible bonded build-up over a qualified substrate or proprietary systemExact unit, substrate, preparation, adhesive/mortar, joints, environmental exposure, movement, pull-off or other required tests and system instructions
Independent openwork screenAn open layer has its own frame, reinforcement, panels or supports and is not assumed to close the building envelopeOpen-area drawing, support/load path, anchors/ties, edge/guard review, impact and falling-object risk, drainage, movement, access and replaceability
Prefabricated brick-faced elementFull or thin units may be integrated with precast, framed or proprietary panels before site installationPanel build-up, insert/connection design, transport/lifting, tolerances, joints, water path, fire route, factory/site quality control and replacement plan

BIA Technical Note 28C documents multiple adhered and panelised thin-brick routes. Its range reinforces a key selection rule: a brick-like face does not disclose whether the units are full or thin, nor how they are supported.

Close the support and falling-object safety case

Map where people, entrances, paths, roofs, vehicles and neighbouring property sit below or beside the work. The project structural engineer should verify self-weight, out-of-plane wind and seismic actions where applicable, impact, eccentric projection, support deformation, anchors/ties/reinforcement, substrate capacity, corrosion/exposure and temporary construction states. Coordinate redundancy or retention where required by the risk assessment and governing rules.

Document inspection access and acceptance criteria for units, joints, supports and fixings. Movement is a system question: BIA Technical Note 18A is one fired-clay masonry reference for expansion joints and flexible anchorage, but local code, the selected route and project calculations control. No photograph can prove safe support or long-term retention.

Do not release the pattern on appearance alone

  • Freeze the exact product and system route, then issue coordinated structural and envelope details.
  • Resolve every edge, return, corner, opening, floor line, change of plane and material transition.
  • Define installer qualification, hold points, tolerances, anchor/tie verification and concealed-work records.
  • Provide a safe inspection, cleaning, repair and replacement plan for the completed facade or screen.

Use samples and mock-ups to turn a reference into a buildable pattern

  1. Product schedule. Record manufacturer, exact code, material/forming route, full or thin identity, dimensions/tolerances, colour/finish and lot traceability.
  2. Range board. Agree the permitted colour, texture, edge and dimensional range using representative production, not one edited photograph.
  3. Bench sample. Test unit orientation, cut quality, mortar or joint colour, bond, relief sequence and transitions at manageable scale.
  4. Full-scale visual mock-up. Include a corner, opening, top/base, maximum projection or openwork bay, representative joints, support interfaces and real viewing distances.
  5. Performance mock-up. Where the specification requires it, test the complete representative assembly under named structural, water, air, impact or other procedures and acceptance criteria.
  6. Control and records. Retain the approved mock-up/range board, log lots and substitutions, photograph concealed work and define repair/rejection rules.

Keep each claim attached to its evidence. Thermal, acoustic, fire, shading, ventilation, daylight, rain resistance, durability and environmental outcomes belong to identified products and complete systems tested, calculated or declared for a stated scope—not to “red brick” as a colour or to an application photograph.

Develop the pattern around an identified product and system

Share elevations, sections, opening details, exposure, support conditions, target colour/texture, module, quantity and governing requirements. LOPO can help review candidate fired-clay units and available product evidence; the architect, facade consultant and structural engineer remain responsible for the project assembly.