Banan Linyuxi is a vertical terracotta baguette application archive, not a universal installation guide.

LOPO’s 2017 article records 50 × 50 mm baguettes arranged vertically around a low-rise residential-project building in Chongqing. The photographs show the completed facade effect, but they do not reveal the supports, anchors, internal components, loads, construction sequence or safety verification needed to reproduce it.

Historical and engineering boundary: the project/location and numerical fields below reproduce LOPO’s October 2017 account and have not been independently re-certified for this rewrite. The stated section and angled/vertical arrangement apply only as archive records. Qualified project parties must verify every current product, support, anchor, connection, load path, movement allowance, retention/fall-prevention measure, installation method and regulatory requirement.
ProjectBanan Linyuxi residential project
Recorded locationNo. 9 Yannan Avenue, Chongqing, China
Archive contextNear Metro Line 3 and the station named “Kane International” in the old English text; near South Mountain
Archive productLOPO terracotta baguette
Recorded section50 × 50 mm
OrientationVertical; selected units reportedly set at project-defined angles
Recorded construction areaNearly 200,000 m²
Recorded planning ratiosFloor-area ratio 2.32; greening rate 32%
Project/design yearNot stated; article published in 2017
Team, item, length and quantityNot stated in the source

Project context recorded in 2017

The archive places Banan Linyuxi at No. 9 Yannan Avenue in Chongqing, close to Metro Line 3 and South Mountain. It names a nearby light-rail station as “Kane International” in its old English translation; that wording is retained as a dated source detail rather than standardized to a current station name.

The source reports a total construction area of nearly 200,000 m², a floor-area ratio of 2.32 and a greening rate of 32%. It refers to four development formats, but the translation does not support a reliable enumeration. No completion year, architect, facade consultant, structural engineer, contractor, installer, product item, baguette length, installed quantity or contract scope is supplied.


2017 LOPO archive view of a low-rise Banan Linyuxi building wrapped with vertical red facade elements
LOPO 2017 archive image associated with Banan Linyuxi. It shows the completed low-rise facade composition, not an installation sequence or concealed system.

Recorded baguette design intent

The old article says the project’s architectural designers selected LOPO terracotta baguettes with a 50 × 50 mm section and installed them vertically to emphasize the building’s vertical lines. It also says some baguettes were set at angles according to the facade and shading intent. No angle, spacing, length, span, support position or orientation schedule was recorded.

The archive’s former product hyperlink included `T80160235` in its URL, but the project text did not identify that string as the installed item number. It is therefore not assigned to this case. Current item codes and dimensions must be confirmed from current product/project documents.


2017 LOPO archive close view of vertical red baguette lines around a long window opening
LOPO 2017 archive image: vertical red elements frame a long glazed opening. The photograph does not establish section orientation, spacing, attachment or shading performance.
Visual-only observation: the photographs show density changes and strong vertical rhythm around glazing and solid facade areas. They cannot be used to measure the baguettes, identify every material, calculate solar control or approve a support detail.

Why this is not an installation method statement

Despite the old title’s word “Installing,” the source contains no installation photograph, fixing diagram, rail section, anchor detail, bracket, pin, internal reinforcement, end cap, fastener, substrate, sealant, tolerance, access method or inspection record. All three body images show completed elevations.

What is recorded

A 50 × 50 mm section, vertical arrangement, some project-defined angles and the intended facade rhythm. These are historical project statements only.

What is missing

Unit length, weight, span, spacing, end restraint, intermediate supports, fixings, substrate, loads, movement, tolerances, fire interfaces, fall prevention and installation sequence.

Who must verify

The responsible architect, facade/structural engineers, system designer, product supplier, contractor, installer and authority, according to the project’s procurement and regulatory framework.

What evidence is needed

Current product data, coordinated drawings, calculations, connection/substrate evidence, required tests, samples, a supported mock-up, installation method and inspection/hand-over records.

Support, anchorage, loads and fall prevention

Define the complete load path from each terracotta unit through pins, inserts or other internal components where applicable, end or intermediate restraints, brackets, rails, anchors and the verified substrate. The project team must establish design wind, gravity, impact, seismic, vibration, maintenance and other actions; combinations and factors; allowable movements and deflections; and component/connection capacities under the governing requirements.

Engineering release points

  • exact product section, length, mass, orientation, permissible span and manufacturing tolerances;
  • support positions, end conditions, restraint directions, clearances and movement accommodation;
  • bracket, rail, anchor and fastener materials, corrosion environment, edge distances and substrate capacity;
  • unit retention, breakage behavior and independent or secondary fall-prevention measures where required;
  • special wind zones at corners, edges, roofs, screens and openings plus construction-stage loads;
  • accessible-zone impact, climbing or grasping, sharp edges and contact with maintenance equipment; and
  • calculations, testing, prototypes, mock-up, site anchor tests and inspection hold points required by the project.

No value or connection shown on this page is an approval. Historic dimensions cannot be transferred to a different unit length, orientation, span, exposure or substrate without project-specific verification.

Coordinate openings, corners and terminations

Window heads and sillsSupport zones, flashings, drainage, glass cleaning, sealants and sightlines
Jambs and revealsEnd pieces, cut-offs, access, movement, shadow gaps and weather interfaces
Corners and roof edgesWind zones, returns, alignment, parapets, terminations and replacement route
Changes in densitySpacing transitions, support continuity, views, daylight and mock-up review
Base and occupied zonesImpact, access, drainage, security, sharp edges and fall-prevention strategy
Adjacent systemsGlass, opaque walls, membranes, metalwork, lighting, signage and maintenance equipment

2017 LOPO archive view of dense vertical red facade lines around signage and a glazed opening
LOPO 2017 archive image: dense vertical lines continue around signage and beside glazing. Interfaces, supports and replacement access must be resolved in current project drawings.

Keep solar intent separate from verified shading

The 2017 copy called the baguettes a sunscreen and linked their angles to shading needs, but it supplied no orientation, angle, spacing, depth, glass data, solar study or measured result. A new project must use its own solar/daylight model to coordinate seasonal sun, glare, views, internal loads and the visual pattern.

Changing angle or spacing can also change wind actions, torsion, support forces, cleaning access, sightlines and the appearance from different directions. These effects need coordinated design and a representative mock-up; the old photographs do not authorize an angle schedule.

Plan installation, QA and maintenance

Prepare a project-specific installation method covering setting out, surveys, access and lifting, storage/handling, support release, connection sequence, temporary restraint, torque or other controlled operations where applicable, tolerances, protection and stop-work criteria. Site teams must follow the engineered drawings, product/system instructions, site safety plan and local requirements.

Define incoming inspection, component identification, anchor/substrate checks, concealed-work hold points, alignment and angle surveys, connection records, damaged-unit isolation, nonconformance closure and final release. Handover should include as-built geometry, accessible inspection points, cleaning guidance, replacement method, spare-unit identification and owner responsibilities.

Review current product and project resources

Use this page as a historical residential application reference, then review current Terracotta Baguette and Louver information. Compare additional work in the Gallery and send the actual design and engineering requirements through Contact.

Prepare the vertical-baguette project package

Send the project location and height, elevations/openings, intended section, lengths, angles and spacing, substrate and support concept, exposure and design actions, visual/shading goals, performance criteria, standards, mock-up/testing plan, quantity and programme. Final product/system selection, engineering, anchorage, installation, fall prevention and compliance remain project-specific.