Campus identity · material evidence · facade coordination
Turn a cultural theme into a buildable campus facade brief
Use verified project identity, deliberate brick-toned composition and a documented sample-to-installation process. Shenzhen Middle School’s Nigang Campus provides the visual reference; the archive images do not substitute for a product schedule, test report or contract record.
- Formal project
- Shenzhen Middle School (Nigang Campus) / 深圳中学(泥岗校区)
- Location
- 1068 Nigang West Road, Luohu District, Shenzhen, Guangdong
- Project year
- Completed and opened in 2020
- Building area
- Approximately 170,000 m² in public project records
- Architect
- HIT Architectural Design & Research Institute
- Commissioning body
- Shenzhen Municipal Public Works Bureau
- Exterior record
- Fired-clay / sintered-clay brick, generic family only
- Not recovered
- Model, dimensions, quantity, assembly, supplier, installer and LOPO role
The archive can now be tied to a named campus
The entrance in attachment 9033 reads “Shenzhen Middle School.” Shenzhen’s municipal school directory places the new high-school campus at 1068 Nigang West Road in Luohu District. A 2020 campus-open-day report records completion after more than two years of construction, a site of over 100,000 m², approximately 170,000 m² of building area and a planned 75 classes / 3,750 residential high-school places.
The project credits published by ArchDaily’s HITAD project record identify the Harbin Institute of Technology Architectural Design & Research Institute as architect, Wu Tao as lead architect, Yuan Quan and Zhou Feng as project managers, Zhang Mingyan and Li Yunping as project leads, and Qu Bing, Yang Wanqing and Chen Chuan for facade design. The same record names the Shenzhen Municipal Public Works Bureau as commissioning body and gives project year 2020.

Build cultural identity through composition, not a slogan
Public project reporting describes a “one centre, two axes, three zones” plan, connected teaching blocks, stepped gardens, red brick and grey roofs. Those choices form a coherent campus language: ceremonial arrival, familiar unit scale, shaded thresholds and landscape woven between teaching, living and sports areas. A cultural theme facade design brief should turn each intention into observable, reviewable decisions.
Hierarchy and arrival
Define the primary entrance, clock or emblem datum, central axis, major corners and secondary doors. Elevation drawings should show where material tone, joint rhythm, arches or bands change to reinforce wayfinding.
Human scale and rhythm
Coordinate the apparent brick module with windows, piers, arcades, parapets and floor levels. Avoid cutting the visual unit randomly at openings; decide how returns, reveals and soffits continue or stop the pattern.
Landscape and climate
Connect covered walks, courtyards, stairs, planted terraces and rain protection to the facade concept. Warm colour alone cannot provide shade, drainage, ventilation, safe access or maintainable interfaces.


Separate the verified material family from an unverified product
A July 2020 Shenzhen construction report, quoting the Municipal Public Works Bureau, describes the exterior walls as using 陶土烧结砖—fired-clay or sintered-clay brick—and notes that the wall-brick construction required careful sequencing and quality control. This supports a broad material-family description. It does not tell a specifier whether the visible units are full masonry, thin brick, mechanically supported pieces or a combination across buildings.
| Question | What this archive supports | What a current project must obtain |
|---|---|---|
| Project identity | Shenzhen Middle School (Nigang Campus), Shenzhen; 2020 project. | Confirm the exact reference area before using any detail as a precedent. |
| Visual material | Brick-toned exterior fields and a public generic fired-clay brick description. | Approved product family, model/code, clay body, finish, colour range and intended location. |
| Unit geometry | No model, face size, depth, thickness, weight or special-piece schedule. | Dimensioned product schedule, tolerances, corner/return pieces, movement strategy and replacement allowance. |
| Wall assembly | No section, fixing, mortar/adhesive, anchor, support, cavity or substrate record. | Coordinated details, calculations and project-specific structural, water, fire, thermal and durability evidence. |
| Quantity and roles | No brick area/count, supplier, installer, purchase order or LOPO role. | Bill of quantities, scope matrix, approved suppliers, installer responsibility, inspection plan and handover documents. |
Do not convert a photograph into a claim about fire resistance, wind resistance, water absorption, frost durability, colourfastness, moisture control, thermal conductivity or service life. Each requirement belongs to the exact product and complete wall assembly under identified standards and project conditions.

Use full presentation images as questions, not approvals
The remaining renderings show the desired relationship between brick-toned walls, planted courts, covered study edges and pedestrian routes. Keep their complete proportions when reviewing the concept, then test the same viewpoints against coordinated elevations, full-size samples and representative mock-ups.


A practical coordination sequence for a themed campus facade
Write the identity brief before choosing a sample
Define the campus story, hierarchy, desired atmosphere, major viewpoints, material roles and elements that must remain consistent across phases. Separate cultural references from literal imitation and identify accessibility, safeguarding and maintenance constraints.
Compare feasible material routes
Review masonry, brick slips, mechanically supported clay units and other proposed systems as distinct assemblies. Ask for current dimensions, mass, tolerances, finishes, support conditions, special pieces, testing and applicable standards for the exact route.
Resolve the elevation and every edge
Issue dimensioned setting-out drawings for grids, bonds, openings, piers, arches, bands, corners, parapets, soffits, bases and movement joints. Coordinate structure, substrate, drainage, waterproofing, cavity/fire strategy and adjacent trades with named responsibilities.
Approve appearance in stages
Move from colour and texture references to full-size units, multi-unit boards and a representative wall mock-up. Review in relevant daylight and wet/dry conditions; retain signed benchmarks for range, blending, joints, workmanship and cleaning.
Connect quality control to traceable records
Record approved lots, delivery checks, storage, substrate acceptance, installer competence, fixing/mortar/adhesive controls, joints, inspections and non-conformance closeout. Handover should include as-built details, cleaning, maintenance and replacement information.
Reference limits
- The images are identified as Shenzhen Middle School’s Nigang Campus; the formal name, Shenzhen location, 2020 project year and broad team attribution are source-supported.
- Public reporting supports a generic fired-clay/sintered-clay exterior-brick description, not a specific LOPO product or wall system.
- No product code, face size, depth, thickness, finish schedule, quantity, fixing, mortar/adhesive, cavity, substrate or as-built detail was recovered.
- No supplier, facade contractor, installer, purchase order, delivery record, warranty or LOPO contractual role was recovered.
- The six retained files support visual and design discussion only; none is a performance test, approval sample, measured elevation or contract document.
- Universal century-life, fire, weather, UV, moisture, thermal and environmental claims from the legacy copy are not retained.
Develop a current clay facade brief
Share the cultural intent, elevations, preferred material route, unit geometry, colour range, interfaces, performance requirements, quantities, sample/mock-up plan, programme and delivery location. LOPO can respond with current product information and project-specific evidence without treating this external reference as a supply record.