The perfect match of red brick and art hotel

Taoxichuan Hotel Jingdezhen uses brick architecture and ceramic-inspired interiors to connect a contemporary hotel with the city’s porcelain culture. The verified project is Taoxichuan Hotel, in The Unbound Collection by Hyatt, in Jingdezhen, Jiangxi, China. David Chipperfield Architects designed the architecture; AIM Architecture designed the interiors and FF&E.

AIM records completion in 2021 and describes an interior sequence organised around porcelain techniques and stages: brick continues from facade to interior, green glazing marks the lounge, cobalt informs the restaurant and spa, light-toned porcelain language shapes meeting spaces, and clay tones define guestrooms.

Formal identity
Taoxichuan Hotel, in The Unbound Collection by Hyatt
Location
Phase II Taoxichuan, Zhushan District, Jingdezhen, Jiangxi, China
Completion
2021, according to AIM Architecture and David Chipperfield Architects
Architecture
David Chipperfield Architects Berlin & Shanghai
Interiors & FF&E
AIM Architecture; design principals Wendy Saunders and Vincent de Graaf
Photography
Wen Studio, as credited on AIM Architecture’s official project page

What the primary project records establish

The current Hyatt property page confirms the operating hotel’s name, address, David Chipperfield Architects credit, three interconnected buildings and 196 rooms including seven suites. AIM Architecture’s project record confirms its interior design and FF&E scope, 2021 completion, design and delivery team, material narrative and Wen Studio photography.

David Chipperfield Architects’ Ceramic Art Avenue Taoxichuan record places the hotel within a larger industrial-site masterplan and publishes the architectural team and client. It also shows why two official area figures must not be merged:

Published figureSource scopeHow to read it
25,000 m² GFAAIM’s Taoxichuan Hotel interior design and FF&E projectUse only for AIM’s published hotel interior scope; it is not a brick quantity or the area of the wider complex.
91,700 m² GFADavid Chipperfield Architects’ larger four-building hotel complexThe complex includes four- and five-star hotel accommodation plus an events venue; do not present it as the 196-room hotel’s interior area.
196 rooms, seven suitesCurrent Hyatt operating-property recordA current room inventory, not an area, material quantity or 2021 construction-package count.
Green-glazed lounge with brick piers and a ceiling of circular and rectangular light openings at Taoxichuan Hotel
Complete 740 × 391 archive image, attachment 9458: green-glazed lounge surfaces, brick piers, mixed seating and a patterned luminous ceiling.

Project photography is credited by AIM Architecture to Wen Studio. The six published body images are retained here at their complete natural dimensions.

Brick is used as spatial continuity, not a stand-alone product claim

David Chipperfield Architects’ wider masterplan responds to the scale and material character of Jingdezhen’s former porcelain-production site. For the hotel interiors, AIM describes its first move as “finishing” the architecture: brick facades are extended into internal rooms and connecting spaces rather than concealed behind an unrelated fit-out.

The archive shows brick piers and walls working beside highly finished glazed surfaces, dark ceilings, terrazzo-like floors, upholstery and timber. That contrast is the transferable design idea. The photographs and project pages do not identify whether every red unit is full brick, a facing unit, a slip or another ceramic component, and they do not publish the manufacturer, module, joint, backing or support.

Restaurant with brick piers, warm-toned booth seating and a dark blue gridded ceiling at Taoxichuan Hotel
Complete 740 × 394 archive image, attachment 9460: restaurant seating is organised among brick piers beneath a dark blue grid and suspended lights.

Ceramic colour and technique organise the guest journey

AIM calls the interior concept “The Road of a Fascination.” Its official record assigns different parts of the hotel to stages in a porcelain journey: lobby as origin, lounge as creation, ballroom as discovery, all-day dining as fascination, spa and pool as appreciation, and guestrooms as return.

Green glazing

The lounge uses a green celadon-related palette. In the archive, glossy green surfaces provide a distinct layer beside red brick rather than imitating it.

Cobalt references

AIM assigns cobalt-related techniques to the restaurant and spa. Colour connects programme to porcelain history; it is not evidence of one tile body, glaze formula or performance class.

Light and translucency

Meeting and ballroom spaces are described through the lightness and transparency of porcelain. The design intent still needs identified ceiling, screen and lighting assemblies.

Clay-toned guestrooms

Guest areas use quieter clay colours, workshop-like textures, canvas surfaces and bench/shelf forms. The palette is a coordinated interior composition, not a generic “terracotta room” specification.

Courtyard-like hotel seating area beneath a perforated white upper surface at Taoxichuan Hotel
Complete 740 × 885 archive image, attachment 9461: a courtyard-like seating area combines a planted centre, dark perimeter surfaces and a luminous perforated upper plane.

Lightness is built from assemblies, not inferred from “porcelain”

The pale perforated surface in this view appears visually light against the planted court and darker perimeter. Its exact material, perforation, suspension, access and fire route are not named in the archive. A project inspired by this effect should develop the ceiling or screen as a complete assembly: module, support, joints, services, lighting, acoustic treatment where required, access panels, cleaning and replacement.

Likewise, daylight, glare, ventilation, acoustics and fire behaviour belong to defined spaces and tested or calculated assemblies. The image communicates atmosphere and hierarchy; it does not provide performance evidence.

Clay-toned Taoxichuan Hotel guestroom with integrated headboard, joinery and sliding panels
Complete 740 × 397 archive image, attachment 9462: a guestroom uses clay-toned surfaces, integrated joinery, fabric and dark metal accents.

Guestroom colour continues the concept at a quieter scale

The bedroom does not copy the public area’s strongest green and blue surfaces. Instead, clay-related colour is spread across walls, joinery, upholstery and loose furniture, while the headboard and partitions organise the room. This shows how a material story can continue through colour, proportion and touchpoints without repeating one finish everywhere.

For a real hotel schedule, separate decorative colour from technical duty. Record cleanability, abrasion, wet-area exposure, slip criteria where relevant, impact, stain response, VOC/emissions requirements, fire and smoke classification, acoustic duty, substrate compatibility and maintenance for each identified finish under the project’s governing methods.

Dark green glazed corridor with reflective floor and circular suspended light at Taoxichuan Hotel
Complete 740 × 885 archive image, attachment 9463: glossy dark-green surfaces, a reflective floor and a circular suspended light create a strongly coloured corridor.

Glazed colour needs a zone-specific finish schedule

Highly reflective green or blue surfaces can intensify colour and light, but the photograph does not identify the tile or panel, glaze, size, joint, substrate or wet-area classification. In circulation, spa, pool or wash areas, select the exact floor and wall products separately and verify their declared use.

Translate the visual reference into evidence

  • Identify manufacturer, product code, body, glaze/finish, dimensions, tolerances, colour range and production lot.
  • Separate wall, floor, ceiling, pool/spa and decorative-only products; one visual family need not use one technical specification.
  • Coordinate substrate, waterproofing or drainage where relevant, fixing/adhesive, joints, movement, edges, transitions and service access.
  • Approve representative samples and a full-scale mock-up under actual lighting; retain the accepted range and cleanability/maintenance procedure.
  • Require named methods and acceptance criteria for slip, wear, chemical exposure, fire, emissions or other performance only where the zone and jurisdiction demand them.
Tall interior void with brick walls and white circulation volumes at Taoxichuan Hotel
Complete 740 × 891 archive image, attachment 9464: brick surfaces continue through a tall internal void beside pale circulation and enclosure volumes.

Keep the brick, tile and enclosure packages traceable

Visible design layerWhat the official record supportsWhat a new project must verify
Brick architectureBrick is an architectural material and continues from exterior to interior in AIM’s conceptFull/thin unit identity, manufacturer, dimensions, mortar/joint, backing, support, movement, water/fire interfaces and exposure
Green/cobalt glazingColour and ceramic techniques distinguish lounge, restaurant and spa themesExact wall/floor product, body and glaze, slip/wear/chemical duty where applicable, substrate, joints and maintenance
Clay-toned roomsGuest areas use clay colours and quieter workshop-related texturesWhich surfaces are ceramic, fabric, coating, joinery or furniture; zone-specific fire, emissions, wear and cleaning evidence
Perforated/light planesMeeting-related spaces explore lightness and transparency as a design themeExact material and assembly, suspension/support, services, access, fire/acoustic route, cleaning and replacement

The official sources reviewed do not publish the brick or ceramic manufacturer, SKU, unit dimensions, facade area, interior finish quantity, attachment or bonding system, product test reports or LOPO contract. Those fields remain open rather than being inferred from the photographs.

Build a project-specific brick and ceramic palette

Share the room/zone schedule, elevations, substrates, exposure, target colours and textures, quantities, maintenance plan and governing test requirements. LOPO can review candidate fired-clay products and available product evidence; the project architect, interior designer and engineers remain responsible for the complete assemblies and interfaces.