TerraFix™ is a coordinated approach to mechanically fixed terracotta tile cladding. Purpose-made fired-clay facing units engage with compatible rails and retaining components, giving architects the colour and texture of clay while allowing the facade contractor to work with a dry-installed outer layer. The concept can be useful where a project team wants repeatable setting-out, an organised cavity and a clear route for inspecting or locally replacing units.
It is important to define the scope correctly. TerraFix™ is not a universal wall assembly, and a tile profile alone does not determine the safety or performance of a facade. The substrate, anchors, brackets, rails, insulation, membranes, cavity barriers, flashings, movement joints and perimeter details must be coordinated and approved for the actual building. LOPO supplies the terracotta facing products and can provide reference component information, samples and manufacturing support; qualified project professionals remain responsible for the completed wall design.

What the TerraFix™ dry-hanging concept includes
The outer facing is made from fired-clay units formed with rear geometry that coordinates with the selected support arrangement. A reference configuration uses horizontal metal profiles with integral retaining points; optional vertical support elements may be required by the approved design. Tile module, profile, colour, texture, corner treatment and manufacturing tolerances are confirmed through drawings and representative samples.
The support components need the same level of scrutiny as the visible tile. The final material grade, coating, thickness, bracket spacing, fasteners and connections must suit the site exposure and design actions. The current TerraFix™ product page presents the available reference configuration and the qualification notes that should accompany it.
Why mechanical fixing can help site coordination
A mechanically engaged facing avoids relying on a site-applied adhesive bond as the sole means of retaining the terracotta units. That can make setting-out, inspection and sequencing easier to control, particularly on repetitive elevations. It may also support local removal and replacement where the approved connection detail and access strategy permit it.
These advantages are project-dependent. Programme or labour savings should be assessed against the actual building geometry, substrate tolerances, access method and installer experience. Open joints, drainage paths and cavity ventilation must follow the approved wall detail; they should not be inferred from a product photograph. A representative facade mock-up remains the best place to confirm appearance, joints, corners, interfaces and installation sequence before full production.

A practical installation and inspection sequence
The installer’s method statement must follow issued-for-construction drawings, the project specification and component supplier instructions. A typical coordination sequence is:
- Survey the substrate and confirm tolerances, anchor zones and pull-out requirements before setting out.
- Set out brackets and supports to the engineered grid, allowing for building movement and adjustment.
- Install rails and isolating components; check line, level, connection engagement and corrosion protection.
- Coordinate insulation, membranes, flashings, cavity barriers, drainage and opening details before they become concealed.
- Fit approved terracotta units in the specified sequence without forcing components outside their tolerances.
- Inspect joints, edges, corners, retaining points and replacement access, then complete the required QA records.
Design approvals that should precede production
The project team should confirm building location and height, facade geometry, wind and seismic actions, substrate capacity, environmental exposure, corrosion category, thermal movement and fire requirements. The tile schedule must also address openings, returns, sills, parapets, corners and transitions to other materials. Nominal dimensions or coverage figures are useful for early budgeting, but quantities should be recalculated from the approved joint module and should include cutting, special pieces and project allowance.
Responsibilities should be recorded in the specification and drawing register. This prevents a common gap in which the visible tiles are approved but anchors, cavity closures or movement details remain unresolved between different suppliers.
Natural fired clay can show an intended range of tone and texture. Approval should therefore use several representative units, viewed under relevant daylight and at the expected facade distance, rather than one isolated sample. Where required, project testing may include anchor pull-out, structural, air/water, fire or other assessments specified by the local design team. Request current reports for the proposed tile and reference components; documents for a different product or configuration should not be treated as automatic evidence.
Where TerraFix™ may be evaluated
The concept may be considered for commercial, residential, hospitality, education and civic facades, as well as selected renovation conditions. Suitability does not follow from building type alone. Height, exposure, substrate, access and local regulation can change the required arrangement. Architects comparing systems can also review LOPO’s broader terracotta facade tile range and terracotta project references.
Prepare a useful project inquiry
For an efficient feasibility review, provide the project country, building type and height, approximate facade area, substrate information, elevations or details, preferred tile size and finish, performance requirements and target schedule. Early information about corners, openings and interfaces helps distinguish a realistic system proposal from a simple material quotation.
Discuss a TerraFix™ facade
Send drawings and the project brief to roger@lopoterracotta.com, or use the LOPO project inquiry page. LOPO can review product feasibility, samples, current reference data and the proposed supply boundary for your project.