Linshan Station, Nanjing Metro Line S3
This transport-architecture case study records how red grooved and beige natural-finish LOPO terracotta panels were arranged across the elevated station facade. The contrasting clay surfaces form long horizontal bands alongside the station’s steel structure.
Linshan Station on Nanjing Metro Line S3
Nanjing Metro Line S3 opened in December 2017. Its first phase runs approximately 36.22 km between Nanjing South Railway Station and Gaojiachong, with 19 stations connecting districts on both sides of the Yangtze River. Linshan is an elevated station near the western end of the line in Pukou District.
The original LOPO project record describes Linshan as a three-storey elevated station and identifies it as the largest of four station facade projects in this supply program. No project quantity is stated in that record, so this case study does not assign an unverified panel area.

A clear facade composition for a long station elevation
The station envelope combines terracotta panels with exposed steel elements. Long horizontal panel courses follow the direction of the elevated structure, while the red and beige areas divide the facade into clearly readable bands.
That restrained arrangement suits the scale of a metro station: material, colour and joint direction establish a consistent visual order without competing with the platforms, circulation routes and structural framework.

Grooved red panels and a natural beige finish
Two distinct clay treatments shape the station’s material palette. Red grooved terracotta panels introduce shadow and texture, while beige panels with a natural flat appearance provide a lighter counterpoint. Both are set out horizontally so the finishes read as parts of one coordinated facade rather than separate decorative elements.
The wide project view also shows why full-proportion images matter for this type of case study: the long panorama makes the continuity of the panel bands and their relationship to the elevated rail structure easier to understand.

Terracotta rainscreen coordination at a transit building
The original project information identifies the facade as a terracotta rainscreen. For a current transport project, panel modules, subframe design, joints, cavity details and interfaces with steelwork must be coordinated against the project drawings and applicable local requirements.
No unsupported wind-load value, fire classification, certification or installed-performance figure is assigned to Linshan Station in this case study. Those items should be reviewed through project-specific technical documentation rather than inferred from photographs or a general product page.

What the project shows for facade planning
Linshan Station is a useful visual reference for architects considering clay panels on long public-transport elevations. Its strongest lessons concern composition and coordination rather than a universal specification.
- use a consistent panel direction to organize an extended facade;
- combine surface texture and colour without losing overall continuity;
- coordinate clay modules with openings, platform edges and steel elements; and
- confirm current panel dimensions, samples, fixing details and technical requirements for each project.
Explore further applications in the Architectural Terracotta Gallery, or review the current rainscreen overview before discussing a project-specific panel layout.

Discuss a terracotta facade for a transport project
Send LOPO Terracotta your elevations, target panel module, colour direction, preliminary quantity and delivery location for a project-specific discussion.