A terracotta rainscreen order succeeds only when every package, interface, verification and approval has a named owner. This guide reframes a PG725 product record published in November 2016 as a procurement-and-responsibility matrix for panels, supports, anchors, backing wall, engineering, installation, evidence and closeout.

The matrix is a coordination prompt, not a contract allocation. Delivery models and jurisdictions differ, so the project team must name the responsible designer, supplier, contractor, reviewer and approver in its own documents. Use the main Terracotta Rainscreen page for current product/system context and the Ventilated Rainscreen Coordination Guide for layer and interface fundamentals.

2016 archive boundary: every PG725 specification, process, minimum-order, delivery and certification field below comes from the 8 November 2016 post or its legacy product metadata. Confirm current item status, dimensions, values, test methods, system scope, commercial terms and document validity before tender, order or approval.

Archived PG725 pale speckled terracotta panel with visible hollow edge
The complete PG725 source image records a pale speckled face and visible hollow edge/profile. It is a historical product visual, not a current system drawing, approved sample, fixing detail or performance result. Select the image to open the full file.

Archived PG725 product, process and commercial record

The values below are retained for traceability. Each requires current confirmation and cannot define a complete rainscreen package.

2016 fieldArchived valueCurrent-use boundary
Item / modelPG725Confirm that the code remains active and still identifies the same body, profile and printed surface.
SizeCustomizedNo dimensions or limits were stated. Confirm module, geometry, tolerances, edges and fixing interface.
ColorMIXApprove current samples, an acceptable range and the production-lot comparison method.
Surface finish3D InkjetConfirm the current face construction, relief, sheen, pattern repeat and compatibility with the selected unit.
MaterialNatural ClayThe opening also used “qualified pure clay,” but supplied no composition or verification. Neither phrase proves environmental benefit.
Legacy process wordingExtruded; fired at more than 1,200 degreesThe source did not state a temperature unit, production range or record. Do not turn this into a current process specification.
Legacy system wordingAdvanced hollow structure and dry hanging systemPromotional wording only. Confirm panel profile, clips, rails, brackets, anchors, backing wall and actual supply/design scope.
Weight31 kg/m²No configuration, method or tolerance was cited. Obtain the current declared value for engineering and logistics.
Water absorptionLess than 0.5%No standard, specimen, laboratory or report was cited. Require current scoped evidence before relying on the value.
Thickness18 mmConfirm the current section and tolerances; the image is not a dimensioned profile and the value cannot transfer to another item.
Minimum order1,500 m²A historical commercial term. Request a current quotation for the selected panel, surface, quantity and schedule.
Lead / delivery time35 daysA historical estimate. Current timing depends on approvals, engineering scope, production, packing, destination and logistics.
Legacy certification textCE, ISO 9001:2008Not presented as current. Request each applicable document with holder, scope, site, product, issuer and validity.
Legacy order routeOrder button enabled to old `/contact-us/` URLUse the current Contact page for project requests.
A panel record is not a system approval. The PG725 fields do not establish loads, spans, anchor capacity, fire performance, water control, thermal/acoustic results, durability, environmental impact or suitability of the complete wall. Assign the relevant design and evidence duties before procurement.

Project responsibility matrix

Replace the “assign before order” prompts below with the actual legal entity, named contact, submission route, review period and approval authority in the project responsibility schedule. A supplier may support several rows without accepting design responsibility for all of them.

Package / interfaceAssign before orderRequired inputs and deliverablesReview / acceptance prompt
Terracotta panels and finishPanel manufacturer/supplier; architect or facade consultant for appearance approvalExact item/profile, dimensions, tolerances, surface range, samples, quantities, packing, handling, maintenance and current product dataWho confirms manufacturability and who signs the sample/range and panel schedule?
Clips, rails and bracketsNamed system designer, component supplier/fabricator and responsible engineerMaterials, interfaces, layouts, calculations, corrosion exposure, tolerances, movement and coordinated drawingsWho owns the complete load path and compatibility with the selected panel?
Anchors and substrateStructural engineer, anchor designer/supplier, substrate trade and installer as assignedDesign actions, substrate properties, edge conditions, anchor selection, survey and any specified site verificationWho accepts substrate capacity, anchor design and deviations found on site?
Backing wall and control layersEnclosure designer and relevant membrane, insulation, fire-stopping and wall tradesBacking-wall build-up, air/water layers, insulation, flashings, drainage, cavity barriers and penetrationsWho coordinates continuity and signs concealed work before it is covered?
Windows, roofs and transitionsArchitect/facade consultant, main contractor and adjoining package designersSills, heads, jambs, parapets, bases, soffits, roofs, expansion joints and penetrationsWho resolves package boundaries, dimensions, seals, flashings and movements?
Engineering and complianceEngineer of record, facade engineer, fire consultant and other authorities defined by the projectCriteria, calculations, current scoped evidence, assessments, code submissions and project testing requirementsWho determines applicability, reviews deviations and grants final technical acceptance?
Shop drawings and schedulesNamed system designer/fabricator/installer with design-team coordinationElevations, sections, panel IDs, joints, supports, anchors, interfaces, tolerances, sequence and revision controlWho coordinates drawings across packages and who releases them for fabrication?
Samples, mock-ups and testingArchitect/facade consultant, contractor, installer, suppliers and test agency as specifiedSample range, visual mock-up, performance mock-up/test scope, acceptance criteria and change recordsWho witnesses, records, approves and controls changes after acceptance?
Logistics and installationSupplier, freight/handling parties, main contractor and specialist installer as contractedPacking, delivery sequence, access, storage, lifting, protection, installation method, inspections and nonconformance processWho bears risk at each handover and who authorizes repair or replacement?
Closeout and maintenanceContractor, installer, suppliers, design team and owner/facilities team as assignedAs-builts, product traceability, inspection records, spare units, cleaning/maintenance guidance and applicable warrantiesWho verifies completeness and transfers the information to the building operator?
Procurement model boundary: “typical” roles are not universal. Design-build, delegated-design, supply-only and installer-designed packages allocate duties differently. The signed contract, project specifications, drawings and applicable law govern; resolve gaps and overlaps with qualified project professionals.

Define evidence by what it actually covers

Product evidence

Match each file to the exact panel item, body, surface, dimensions, plant and date. Record the standard and edition, specimen, laboratory or issuer, results, scope and validity.

Component evidence

Clips, rails, brackets and anchors need their own current data and compatibility checks. A panel test cannot establish an anchor or support capacity.

Assembly evidence

Whole-wall fire, water, air, thermal, acoustic or structural outcomes require evidence applicable to the defined build-up and project conditions. Do not combine unrelated reports into an invented approval.

Project engineering

Calculations and details must use the project geometry, actions, substrate, exposure, movement and tolerances. Generic literature cannot replace the responsible engineer’s work.

Samples and mock-ups

Visual acceptance, workmanship and performance testing are different gates. State the purpose, scale, acceptance criteria, signatories and consequence of later changes.

Management certificates

ISO 9001 relates to a certified management-system scope; it is not a panel-performance or environmental result. Any CE reference requires the applicable current product document and scope.

Procurement gates and release decisions

  1. Basis of design: define target panel, finish, module, interfaces, criteria and current feasibility without treating the 2016 PG725 record as a specification.
  2. Tender issue: publish a responsibility schedule, package boundaries, evidence list, design criteria, mock-up/testing duties and submission programme.
  3. Technical submittal: reconcile exact products, components, current documents and proposed deviations with the project requirements.
  4. Samples and mock-up: record approvals, limitations, unresolved work and the benchmark that production and installation must follow.
  5. Coordinated design: complete calculations, shop drawings, interfaces, substrate information, tolerances and approvals before fabrication release.
  6. Production release: freeze approved item/profile, finish range, quantities, panel schedule, packing, delivery sequence and change authority.
  7. Site release: verify substrate, access, storage, installers, current drawings, hold points and concealed-work records before closing the facade.
  8. Closeout: deliver traceability, inspection/as-built records, maintenance guidance, spare-unit strategy and assigned follow-up duties.

A “reviewed” stamp should not silently transfer responsibility. Each submission should state what was reviewed, by whom, for which scope and whether fabrication, installation or another gate is released.

Preserved PG surface board


Complete archived granite-look terracotta board showing six PG item references
The complete uncropped 2016 board preserves six surface references and every label. Current colours, item status, profile compatibility and availability require confirmation.

Readable legacy item references on the board:

PG009
PG258
PG252
PG008
PG727
PG725

The board supports finish shortlisting only. It does not prove that all six references remain available, share one profile or can use the archived PG725 specifications. Assign current sample approval, range control and production-release responsibility in the matrix.

Archived application and project claims need a current review

The 2016 article described curtain-wall, exterior-wall and cladding-panel use, then marketed the product for new and renovated exterior walls; metro, railway, tunnel and underground projects; European- or American-style architecture and villa walls or roofs; ceilings; office buildings and commercial podiums; interior walls; and surgery rooms, clean rooms, pharmaceutical facilities and food-production workshops.

That list is preserved as historical context, not approval evidence. Each use requires assigned design, product, installation and verification duties for its substrate, exposure, hygiene or emissions criteria, cleanability, access, structural actions, fire strategy, enclosure design and governing codes.


Archived building facade image with a circular close view of a stone-look terracotta surface
The source called this image “Project” but supplied no project name, location, architect, date, installed quantity, support scope or PG725 confirmation. It is retained only as an unidentified visual reference, not a verified PG725 system case study.

Use the Architectural Terracotta Gallery for identified precedents, while keeping responsibility and evidence tied to the proposed building and contract.

Define the package before requesting a quotation

Send the project location, drawings, target panel and finish, preliminary quantity, criteria, procurement model, proposed scope split, evidence list, delivery destination and programme. Identify which party will design supports and anchors, approve samples, coordinate interfaces and release production.