A brick facade is composed through product identity, colour range, surface, module, bond, joints and construction—not by choosing a universal “paste, build or thread” routine.
This guide replaces the old three-axis formula with a coordinated selection workflow. It helps architects distinguish full bricks from slips, tiles and mechanically retained units, then carry the intended character from distant massing to close-up workmanship and documented whole-wall evidence.

Identify the product before composing the facade
“Terracotta brick” is not one technical category. Record the manufacturer, item, clay body, format, work size, tolerance, mass, surface, intended application and declared evidence before choosing a bond or support route. A full brick, a thin slip and a hollow screen unit may share a colour but cannot exchange details.
| Product route | Define before selection | Do not infer from an image |
|---|---|---|
| Full brick masonry or veneer unit | Structural or non-structural role, mortar, bond, support, ties/anchors, cavity, flashings and movement | That a visible brick wall is loadbearing or that one bond suits another building |
| Brick slip or thin tile | Exact thickness/form, substrate or carrier, attachment, joints, edges, drainage, movement and replacement | That a slip behaves like full brick or that “pasting” is a complete system |
| Mechanically retained unit or screen | Unit perforations/slots, orientation, rails/rods/clips, spans, edges, redundancy, tolerances and engineered loads | That holes authorize threading, drilling or a generic dry-hang detail |


Control colour and texture as a range, not a screen swatch
Define the intended distribution of colour and texture with representative physical samples. Record item/batch references, accepted range, smooth and textured faces, orientation, joint colour/profile and the viewing conditions used for approval. A multicolour facade may look random while relying on a deliberate mix schedule; a single-colour field can still vary with firing, surface, light and distance.
Agree how units from deliveries or batches will be blended, checked and replaced. Retain signed control samples and a representative jointed panel. Web photographs are useful for discussing atmosphere, but not for approving hue, gloss, texture depth or acceptable variation.



Build the module through bond, joints, corners and openings
Set out the facade from actual work sizes plus the designed joint. Coordinate course heights and vertical joints with floor lines, openings, sills, heads, parapets, bases and adjoining materials. Draw where whole units, special shapes or approved cuts occur; do not leave awkward closures to site improvisation.
Bond is more than a graphic pattern. It interacts with support, stability, tolerances and movement. At corners, decide whether faces wrap, interlock or meet a separate return. At openings, resolve the visual module together with frames, flashings, membranes, seals, drainage, insulation and replacement access.





Check the composition from city scale to hand scale
At long distance, test massing, colour fields, major openings and how brick meets roof, ground and neighbouring materials. At middle distance, review bond direction, bands, piers, recesses and pattern transitions. At close range, examine face range, chips, joints, edges, corners, cut units, staining risk and the relationship to metal, glass, stone and sealants.




Treat openwork as a complete screen system
Open bonds can filter views and light, but the size and distribution of voids also affect rain entry, local wind, impact/access, falling-object risk, cleaning and the continuity of water, thermal and fire layers behind. Confirm whether the screen is independent, tied masonry, mechanically retained units or another engineered assembly. Define edges, bases, parapets, openings and transitions—not only the centre of the pattern.


Approve a mock-up and whole-wall evidence
Visual and dimensional control
Approve actual unit identity, colour/texture range, blend, bond, joints, orientation, corners, openings, cuts, transitions and workmanship against retained samples.
Structure and movement
Assign self-weight, wind, seismic/impact where applicable, supports, ties/anchors, substrate, tolerances, deflection, joints, corrosion compatibility and replaceability to the responsible designers.
Water and fire
Coordinate face, cavity or carrier, flashings, drainage, membranes, insulation, cavity barriers, fire-stopping, openings and interfaces as one tested/documented project assembly.
Maintenance and closeout
Record product/batches, elevations, concealed work, inspections, cleaning trials, access, replacement sequence, spare units and responsible parties without promising a universal service life.
- product schedule, current availability, dimensions/tolerances, mass, surface range and intended application;
- coordinated elevations, bond maps, joints, corners, openings, movement and adjoining-material details;
- complete system design, calculations, anchors/supports, water/fire interfaces and applicable standards;
- representative mock-up, signed control samples, tests/inspections, installer competence and change control; and
- as-builts, product/batch records, cleaning/maintenance instructions, replacement access and spares.
Compare current Terracotta Brick, Ceramic Brick Slips and Long Format Bricks, then request item-specific samples and evidence through Contact.
Prepare a brick facade composition brief
Share the building and exposure, full brick/slip/tile or screen route, actual unit schedule, colour and texture range, module and bond, joints, corners and openings, substrate/support concept, interfaces, evidence requirements, mock-up scope, quantity and programme.