Discover how LOPO Terracotta's 3.6-meter panels redefine modern architecture at the Azure Cartier Center in Chengdu Tianfu New Area. Explore the blend of traditional Chinese aesthetics and innovative design in this iconic urban landmark.

A 3.6 m terracotta panel design release should begin with an elevation decision, not a “world’s longest” claim. The design team must first show where an extra-long unit improves the building grid, how it ends at openings and corners, and which project evidence permits that exact unit and complete assembly to advance.

This page is the architectural gate between a long-panel idea and a frozen elevation package. The separate 3600 mm Panel Qualification Guide owns unit feasibility, repeatable manufacture, logistics, handling, support and test evidence. The Third Production Line Archive owns dated line/capacity verification.

Separate archive evidence from a release document

The 17-second media record shows one light-coloured ribbed unit leaning against a LOPO-branded wall with an overlaid `Length 360cm terracotta panel` label. It does not identify its profile code, width, thickness/section, mass, tolerance, finish, manufacturing site, support zones, test basis, current availability or intended project. It also does not demonstrate installed behaviour.

Attachment 10079, a 17-second 1920 × 1080 MP4 (about 21.7 MB), converted from the legacy WordPress shortcode to native accessible video. It is a dated visual record, not a scale test, lifting method, installation demonstration or current product declaration. Open the original MP4.
Do not let one document stand in for another
RecordWhat it can establishWhat it cannot release
2024 archive mediaLOPO published imagery labelled 360 cm and an unidentified long ribbed sample.Current product, exact section/mass, manufacturing reservation, project suitability, assembly or installation.
Dated manufacturer statementExact product/custom reference, site/line, current feasible dimensions/finish/quantity, trial and programme assumptions.Building geometry, structural design, interfaces, code acceptance or release to install.
Controlled product drawingProfile/section, dimensions, tolerances, mass, orientation, support zones, edges/specials and revision.Full elevation distribution, substrate/anchors, movements, water/fire strategy or project load cases.
Project assembly packageElevation, interfaces, load path, support, anchors/substrate, joints, enclosure/fire coordination, calculations/tests and method.Production slot, final order, batch/finish or site readiness unless those records are also linked.
Signed release registerWhich exact revision may advance to sample, test, procurement, manufacture or installation, with conditions and approvers.Any later revision or unresolved deviation; every change needs impact review and recorded disposition.

Gate 1: prove that the elevation needs a long unit

Compare the extra-long option with a shorter-module baseline. Reducing some horizontal joints may strengthen a vertical reading, but it can also change special pieces, breakage/replacement, support visibility, tolerances, handling and cost. The release record should state the project reason—not assume that longer is automatically better.

Grid fit

Align the proposed length with floor-to-floor, window, mullion, parapet and structural zones. Record whether the nominal module actually lands on buildable supports.

Joint intent

Mark every retained joint and explain its visual role. A longer piece does not create a joint-free facade, and movement/water requirements still govern.

Openings and specials

Identify heads, sills, corners, returns, penetrations and short residual zones. Do not assume field cutting, notching or custom specials are permitted.

Orientation and profile

Freeze vertical/horizontal orientation, rib direction, face/section and finish. The archive sample’s appearance does not define a project unit.

Replacement logic

Show removal path, access, lifting/handling zone and labelled spares. One damaged long unit may affect a larger elevation area and more interfaces.

Zone strategy

Use extra-long units only where their value is visible and coordinated. Standard modules may remain preferable at complex or maintenance-intensive zones.

Gate 2: freeze the elevation before requesting release

Map

Issue dimensioned elevations/sections with every long-panel zone, grid, level, opening, corner, interface and unit orientation.

Schedule

Link each location to exact product/custom code and drawing revision, nominal/actual dimensions, tolerance, mass, finish and quantity.

Detail

Close base/top/side, joints, corners, heads/jambs/sills, transitions, movement, drainage and replacement access.

Coordinate

Overlay structure, subframe/anchors/substrate, membranes, insulation, cavity/fire barriers, glazing, services and temporary works.

Validate

Cross-reference current manufacturer feasibility, calculations, configuration-matched evidence, mock-up/test and approved sample range.

Register

List every open item, owner, due date, dependent document and permitted next stage. No silent “approved with comments.”

No photo-derived dimensions: do not scale the archive unit or the project collage, count grooves to infer width, or assume that visible vertical modules are 3.6 m. Only the controlled project/product drawings and current manufacturer statement may define the unit.

Use project imagery as intent, not length proof

Complete archive collage of twin towers and close views of vertical ribbed facade zones
Complete 1220 × 1220 original, attachment 10078, restored from the legacy 930 × 930 display. Its attachment metadata names the Azure Cartier Center in Chengdu Tianfu New Area, but this post supplies no architect/source record, product code, measured module, quantity or proof that the visible units are 3.6 m. The separate project page must own any verified case facts.

The collage can communicate a target of strong vertical ribs, repeated narrow bays and restrained horizontal breaks. Translate that intent into the project’s own grid and documented evidence. Do not present the image as a tested precedent for span, fixing, fire/water performance, ease of installation, energy use or LOPO’s contractual role.

Gate 3: close system and site dependencies

Minimum dependency record before a stage can advance
DependencyRelease evidenceResponsible review
Unit and productionCurrent exact product/custom drawing, trial/first-article plan, finish range, tolerances, quantity, yield/QA, plant/line and dated capacity/programme confirmation.Manufacturer/supplier, architect and contractor/procurement team.
Structure and supportActions/load path, serviceability, local support zones, unit/connection/subframe/brackets/anchors/substrate, movement, tolerances, fracture/fall risk and temporary states.Structural/facade engineer and relevant specialists for the exact assembly.
Enclosure and fireJoints, water shedding/drainage, air/thermal layers, membranes/insulation, openings, cavity/fire barriers, material compatibility and replacement interfaces.Architect, enclosure/fire specialists and facade team under applicable requirements.
QualificationConfiguration-matched product/connection/subassembly/full-assembly evidence, mock-up/test scope, acceptance, deviations and approved appearance sample.Named project reviewers and authorities where applicable.
Logistics and installationPackaging/transport route, storage/support, handling/lifting trial, equipment/access, sequence, weather limits, temporary protection and replacement plan.Manufacturer, logistics team, contractor/installer, engineer and site safety team.
Commercial and recordsFinal quantity by zone, spares, order/revision, lead time, release dates, inspections/hold points, NCR/change process and handover/as-built fields.Client, contractor, supplier and design team according to the responsibility matrix.

This is a gate index, not a repeat of the detailed qualification work. Use Post 9977 for the long-unit evidence pathway and Post 9826 for dated production-line claims. Post 10077 only decides whether the current elevation package has correctly incorporated and referenced their results.

Use stage-specific status—never one blanket “approved”

Hold

A critical identity, geometry, interface, engineering, test, capacity or site dependency is unresolved. No dependent stage advances.

Released for sample or trial

Only the named sample, first article, handling trial or mock-up may proceed under its stated configuration and acceptance criteria.

Released for procurement

The dated quotation/order may advance for the exact item/revision, quantity, finish range, evidence, programme and conditions listed.

Released for manufacture

Design, product, finish, quantities, drawings, QA/hold points, trial/test disposition and change control are frozen for the named batch.

Released for installation

Approved materials, supports/substrates/interfaces, method, equipment/access, site conditions, inspections and temporary protections are ready.

As-built and handed over

Locations, product/batch, revisions, inspections/NCRs, tests, maintenance/access, replacement method and labelled spares are retained.

Every status entry should name the package, exact revision, zone, allowed action, conditions, open items, approver and date. A later design or product change reopens affected checks; an archive article never substitutes for a signed release.

Keep performance and capability claims outside the gate

Claims not released by this page

  • `world’s longest`, first, revolutionary, unmatched or new-standard status;
  • current 3.6 m availability, arbitrary width/profile/finish, capacity, lead time or suitability for every project;
  • inherent durability, low maintenance, environmental resistance, thermal regulation, energy saving or sustainability;
  • easy, safe or faster installation, reduced cost, lower risk or better lifecycle outcome; and
  • project adoption, architect endorsement, energy improvement or LOPO design/installation/system responsibility without a traceable case record.

Any claim requires the exact current product and assembly, defined method and boundary, applicable project conditions, responsible review and dated evidence. Environmental comparisons additionally need product- and plant-specific documentation plus transport, installation, yield/waste, service, replacement and end-of-life assumptions.

Prepare a release pack for one exact elevation

Share marked elevations and long-panel zones, current product/custom drawing, unit schedule and quantities, finish/sample range, interface details, responsibility matrix, qualification/test references, programme/capacity statement, logistics/site plan, approval statuses and unresolved items. Request a dated next-stage release—not a general capability promise.