School Lokomotiv in Yaroslavl appears in LOPO’s archive as a 2015 Russian project using red terracotta facade panels and terracotta baguettes. The surviving photograph and short construction video document work in progress rather than a completed architectural survey. They are valuable project records, but the old quantities, scope and completion wording should be checked before being reused in a formal reference.
Archived project facts
These values reproduce the original 2016 page. They do not establish current availability, final installed quantity or the exact areas assigned to each product. Request current drawings, completion records and product documentation if the project is used as a technical precedent.
What the construction photograph shows
The image records a multi-storey elevation under construction, with scaffolding in front of red-brown rectangular terracotta panels. Openings, incomplete lower areas and visible support work make this an installation-stage view. It can demonstrate module and colour direction, but it cannot confirm finished junctions, final cleaning or long-term performance.

The archived text called the material a plain red clay panel with a gentle, simple colour. Natural fired-clay variation may be part of that reading, but a current project should approve several physical samples and a permitted colour range rather than depend on one site photograph.
Resolve the archived scope discrepancy
The old article says LOPO participated in finishing “interior walls” of the school. The photograph clearly shows an external elevation, and the video also appears to record exterior construction around red and blue building volumes. This may be a translation error, a mixed interior-and-exterior scope, or an incomplete project description; the available page does not resolve it.
A responsible case study should therefore describe the media directly and attribute the product quantities to the archive, without asserting a complete facade or interior scope. If the distinction matters, consult project drawings, delivery records or later completion photographs.
Panels and baguettes play different facade roles
Terracotta panels
Panels create the main opaque field and must be coordinated with rails, brackets, clips, cavity, insulation, membranes, open joints and window interfaces.
Terracotta baguettes
Linear profiles may act as screens, fins or feature elements. Section, span, orientation, reinforcement and support spacing require their own engineering.
Colour coordination
Panels and profiles should be reviewed together if they are intended to match. Different sections can fire differently even within the same nominal colour family.
Installation sequence
Numbered drawings and packing help avoid clashes between panel grids, baguette supports, glazing, corners and access requirements.
Where panels and baguettes meet, the support zones should be drawn rather than left to site adjustment. Aligning a baguette screen with panel joints can simplify the visual rhythm, but the two systems may need independent rails and movement clearances. Window heads, sills, corners and parapets should show how drainage continues behind both product types. If baguettes sit in front of glazing, confirm outward views, cleaning access and a safe way to replace one profile without removing a large area.
The listed quantities also need consistent units: panels are recorded by square metre, while baguettes are recorded by linear metre. A current schedule should add piece counts, lengths, cut allowances and spare quantities so procurement can be checked against shop drawings and packing lists.
Cold-climate specification needs project evidence
Yaroslavl’s location makes moisture and low-temperature exposure relevant, but the archive provides no project-specific test data. Do not infer freeze–thaw suitability from the photograph or from a general statement that terracotta is environmentally friendly or high quality. Obtain current water-absorption and freeze–thaw reports for the exact product and review the complete wall design.
Drainage, ventilation, flashings and joints should limit persistent saturation. Allow for thermal movement and construction tolerances, specify corrosion-resistant supports suitable for the environment, and consider snow, ice and safe maintenance access at lower edges and entrances. Local fire, structural and energy requirements remain the responsibility of the project team.
Mock-ups should be exposed or tested under conditions relevant to the specification, then inspected after installation. The review should include panel edge condition, clip engagement, profile end restraints, joint consistency and water discharge. A colour sample alone cannot answer these system questions.
Lessons for a current public-building facade
- Define whether panels and baguettes are exterior, interior or both, and mark their areas on drawings.
- Confirm current product codes, sections, quantities, tolerances and supporting test reports.
- Coordinate wind design, cavity, moisture, fire, thermal movement and replacement access.
- Approve panel and profile colours together through representative samples and a mock-up.
- Record installation sequence, inspections, as-built information and spare components.
Site photography should continue through completion, not stop at scaffolding stage. Overall elevations, typical joints, corners, openings and baguette connections create a more useful record for future architects. As-built drawings and inspection reports are equally important because photographs cannot reveal concealed rails, membranes or anchors.