A terracotta project reference is useful only when the building, image, product and supplier role can be traced to controlled records. A name in a marketing list or a photograph in a collage is a lead—not evidence that a particular material, system or company role belongs to that project.
This guide turns dated portfolio material into a reviewable reference register. It is intentionally separate from corporate due diligence, manufacturing history, product-benefit evidence and the Project Gallery: its single job is to decide whether a reference is identified, attributable and safe to publish or use in a project decision.
Read the source material before assigning a project
The first archive strip combines meetings, office work, an equipment discussion and a site document review. People, dates, facilities and activities are not identified. It can be retained as dated company imagery, but not as proof of technical review, quality control, partnership or a completed project.

The next strip places a factory entrance beside two hollow profile samples. The image does not identify a current product code, dimensions, material test, site ownership, available line or production reservation.

The third strip shows six document thumbnails. A small image cannot prove issuer, holder, standard, product scope, factory, validity period, surveillance status or suitability for a current specification.

Give every reference an explicit evidence status
| Status | Minimum record | Permitted use |
|---|---|---|
| Unidentified lead | Image, marketing name or informal note only; no unique building identity or source chain. | Internal research queue only. Do not caption, credit, map, claim supply or use as technical precedent. |
| Identified reference | Unique official project name, location and source, with phase and date boundaries. | May name the building and source; no material, role or performance claim yet. |
| Attributed reference | Owner/client, architect and relevant project team are supported by primary or authoritative records; image rights/credit are recorded. | May publish the verified credits and bounded images. |
| Product-matched reference | Approved submittal, purchase/order or supplier record ties exact product, finish, dimensions, quantity/area and project phase to the building. | May state only the matched fields and dated supplier role. |
| Performance-evidenced reference | Configuration-specific calculations, tests, approvals and as-built records identify the complete assembly and project conditions. | May describe the exact verified outcome and boundary; photographs alone never reach this status. |
A reference can move backwards when its source expires, a project phase changes, images are re-credited or the product/system record is superseded. Record the reviewer, date, source URL/document number, revision and next action rather than marking a row simply “verified.”
Build the register around facts that can be checked
Identity
Official local-language and English project names, unique address/location, building type, phase and authoritative source.
Dates
Design, construction, completion and photography dates kept separate from article upload or media-library dates.
Project team
Owner/client, architect, facade consultant, contractor, installer and photographer, each with source and role wording.
Product record
Material family, exact item/custom drawing, dimensions, finish, quantity/area, batch and approved sample—not a photo guess.
Supplier role
Manufacturer, seller, designated supplier, system provider, fabricator or installer stated only as the controlling record supports.
Media rights
File origin, photographer/owner, licence/permission, caption, date, depicted view and any edits or composite status.
Role boundary: supplying a fired-clay component does not establish facade design, engineering, system responsibility, installation, testing, whole-building performance or project completion. Keep each role separate in the register.
Keep company evidence outside the project column
The 2024 aerial graphic bears the text “LOPO Terracotta Facade Panels Plant,” “Zhangzhou, China” and “220,000 SQM.” That is a dated embedded claim, not a current legal-site schedule, measured survey, ownership record, product-specific capacity or delivery commitment. Current projects should use the Facilities page as a starting point and request a dated entity/site/line/capacity statement for the exact product, finish, quantity, testing, packing and programme.

Likewise, a company About page, factory photograph or certificate register cannot prove participation in a particular building. Corporate identity/site/certificate checks belong in supplier prequalification; the project register should link the exact entity and document rather than repeat promotional claims.
Treat the three legacy project names as research leads
| Legacy name | Traceable record | Release status and missing evidence |
|---|---|---|
| Shingu University in Korea | A separate 2014 LOPO archive contains two images and historic item/size statements. | Archive lead only: confirm unique campus/building, official team, project dates, exact phase, current product identity, quantity and LOPO contract role from controlling records. |
| Vanke Sales Center in Beijing | The 2024 post supplies only this non-unique English name and a promotional material statement. | Unidentified lead: official project name/address, phase, team, source, product, quantity, dates, image match and supplier role are absent. |
| Government Building in Yunnan | The 2024 post supplies no city, agency, building name, team, date or linked image. | Unidentified lead: do not publish it as a case or rainscreen precedent until a unique identity and complete source chain exist. |
The legacy sustainability, durability, weather protection and landmark language is not retained. Even when a project identity is resolved, product and assembly outcomes need their own exact evidence; a supplier-authored archive is not independent performance verification.
Do not force an unidentified collage into a case study

For a composite, create a panel-by-panel manifest before publication: crop position, unique project ID, caption, source/credit, permission, date, depicted product/zone and evidence status. If even one panel remains unidentified, label it as an unattributed archive reference or replace it with a traceable image—never infer a case from visual similarity.
Release a reference through a controlled workflow
Intake
Record the original name, image/file, claimant, source, date and proposed public statement without editing ambiguity away.
Identify
Resolve the unique building, location and phase using official or authoritative sources; list conflicts explicitly.
Attribute
Verify team roles, image ownership/credit and LOPO’s exact dated commercial role; do not collapse distinct entities.
Match
Tie product fields and quantities to approved submittals, orders, shop drawings, batch records or other controlling evidence.
Bound
Separate component facts from complete-wall and whole-building outcomes; state dates, methods, scope and limitations.
Approve
Record reviewer, revision, allowed caption/claims, linked evidence, expiry/recheck event and unresolved fields.
- the project cannot be uniquely identified or the image-to-project match is unproven;
- the product, dimensions, finish, quantity or phase was inferred from a photograph;
- supplier, designer, engineer, contractor and installer roles are conflated;
- a certificate, factory or sustainability statement lacks current scope and exact entity/product/site;
- performance is asserted without a configuration-matched calculation, test, approval or as-built record; or
- photo rights, credit, edits/composite status or permission for portfolio use are missing.
Submit one reference as an evidence pack
Send the official project name and address, team/source links, project phase and dates, exact product/submittal/order fields, LOPO role record, image originals and rights, approved captions, performance evidence boundaries and open questions. The result should be a traceable Gallery entry—not another unsupported global-portfolio claim.