LOPO Terracotta Cladding Hospital Project in Beijing

This case archive documents terracotta cladding photographed at the relocated Miyun hospital campus in Beijing.

It combines the dated product record from LOPO’s January 2018 article with the institution identity and relocation dates now published by the Miyun District government. Conflicting areas and completion dates are shown rather than silently reconciled.

Evidence boundary: the original English page calls the institution “Miyun Hospital” and “Beijing Miyun Hospital.” The current Chinese government listing names it 北京市密云区医院(北京大学第一医院密云医院). “Beijing Miyun Hospital” is retained here as the archive’s English name, not presented as an officially approved English translation. This page does not establish LOPO’s contract role or any clinical, infection-control, fire, water, thermal or durability performance.
InstitutionBeijing Miyun Hospital, as named in the 2018 English archive
Current official Chinese name北京市密云区医院(北京大学第一医院密云医院)
LocationMiyun District, Beijing, China; current official address: 阳光街383号
Relocation project datesStarted 28 April 2011; opened for use 20 October 2014
Archive productF4518001, Ivory White terracotta cladding
Archive dimensions450 × 900 × 18 mm
Archive area record57,000 m² site; about 37,000 m² construction area, scope not defined
Team, quantity and LOPO roleNot stated in the source

Institution identity and relocation record

The Miyun District government institution listing identifies the hospital under its current Chinese name, gives its address in Miyun District and records a 1955 founding. It states that the relocation project began on 28 April 2011, was completed in August 2014 and entered use on 20 October 2014.

LOPO’s 2018 archive agrees on the start and opening dates but gives 28 May 2014 as completion. It also records a 57,000 m² site and about 37,000 m² construction area. The current government listing reports much larger overall site and building figures, so the older numbers cannot safely be presented as the hospital’s current totals; they may reflect a different project boundary, phase or an inaccurate historical source.


2018 LOPO archive overview of the Miyun hospital building in Beijing
LOPO 2018 archive overview of the relocated hospital building. The photograph documents appearance, not facade-system performance or contractual responsibility.

Award material is retained without a causal claim

The old page presented the following certificate, medal and trophy montage as evidence of a “2014–2015 National Quality Project Award.” No issuer record or award citation was linked, and the image alone does not establish the award category, recipient, project scope or LOPO’s role.


Certificate medal and trophy montage reproduced in the 2018 Miyun hospital archive
Archive award montage. The original attribution should be checked against the award issuer’s project and recipient record before reuse as a verified credential.
Claim removed: the former text said the terracotta cladding’s “perfect performance” made a strong contribution to the award. No test, assessment or award citation supported that cause-and-effect statement, so it is not retained.

Recorded ivory-white terracotta cladding

The dated product schedule names item F4518001, colour Ivory White and nominal size 450 × 900 × 18 mm. The photographs show a light-toned modular field around dark window bands and glazing, with panel joints readable across the tower and lower blocks.

Those fields are a 2018 historical record, not a current product offer. Availability, colour range, surface, manufacturing tolerances, quantities and replacement compatibility must be checked against current samples and project documents. The old page gives no installed area or unit quantity.


Close archive view of light terracotta cladding and dark window bands at Miyun hospital
Closer view of the light cladding grid, dark glazing and projecting horizontal bands. Concealed attachments and wall layers are not visible.

Entrance and facade composition

The street-level photographs show a lower entrance wing beside the taller hospital block. Light rectangular panels provide a continuous datum around window openings, while a darker vertical glazed strip and projecting slabs divide the larger mass.


Archive view of the Miyun hospital entrance wing and terracotta-clad tower
Entrance-side archive view. Canopy, cladding, glazing and base interfaces require their own coordinated project details.

Archive view along the Miyun hospital facade with light terracotta panels and windows
Archive view along the facade. The complete wall build-up, anchors, cavity and perimeter seals cannot be inferred from the finished elevation.

Panel and joint layout

Coordinate current module, joint width, colour range, corner conditions, openings, returns, soffits and replacement access from approved drawings and samples.

Support and movement

Qualified project parties must establish substrates, brackets, anchors, load paths, movement accommodation, tolerances and falling-object safeguards.

Water and enclosure

Assign drainage, ventilation where applicable, membranes, flashings, seals, interfaces and testing to the complete specified wall system.

Healthcare boundary

Exterior photographs and a panel item do not evidence infection control, interior hygiene, clinical continuity, fire safety or patient-safety outcomes.

Conflicting historical fields remain visible

Field2018 LOPO archiveCurrent government listingPublishing treatment
Institution nameMiyun Hospital / Beijing Miyun Hospital北京市密云区医院(北京大学第一医院密云医院)Keep the archive English name and show the current Chinese identity
Construction completion28 May 2014August 2014Do not choose one silently; retain the dated discrepancy
Opening for use20 October 201420 October 2014Supported by both records
Area57,000 m² site; about 37,000 m² construction area168 mu site; 138,672 m² building areaTreat old figures as an undefined historical project scope, not current hospital totals
Project team and LOPO scopeNot named or definedNot addressed on the institution pageDo not infer designer, contractor, installer or supplier contract

Information required for a current facade brief

Confirm before specification, pricing or construction

  • project identity, building/phase boundary, current drawings, survey and responsible design team;
  • selected panel item, finish, dimensions, tolerances, colour range, quantities and approved samples;
  • complete wall build-up, support/anchors, loads, movement, joints, drainage, waterproofing and openings;
  • project-specific fire, thermal, acoustic, weather, corrosion, impact, maintenance and replacement requirements;
  • applicable local regulations, authority approvals, test evidence, calculations and facade-access strategy; and
  • representative mock-up, acceptance criteria, inspection hold points, records and handover information.

The former page’s generic energy-saving, environmental and material-performance statements are not carried forward. Evidence must apply to the identified product and complete proposed assembly under the actual project’s exposure and regulatory conditions.

Review current terracotta facade resources

Use this page as a bounded historical case, then review the current Terracotta Rainscreen resource and comparable work in the Project Gallery. Send the current drawings, finish target and performance brief through Contact.

Prepare a project-specific terracotta cladding enquiry

Share the building and phase, elevations, panel module and finish, quantities, substrate and support concept, interface details, exposure, required evidence, standards, mock-up plan and programme. Final selection, engineering, enclosure design, installation, healthcare constraints and compliance remain the responsibility of the qualified project team.