A factory supply terracotta floor tile enquiry should test what can be supplied now, how it will be controlled and how every batch will be traced. Factory status is not product approval. The project needs a current product identity, evidence schedule, production quality plan, realistic programme and documented response to change.

Verify the supplying entity and scope
Record the legal supplier, manufacturing location, product family and responsibilities for samples, testing, production, inspection, packing, freight and claims. Clarify whether any process or component is subcontracted and who controls it. The goal is a clear chain of accountability, not a generic factory description.
Ask which site and production route will make the proposed order and whether that route matches submitted samples and reports. If the route changes, define the review required before production continues. Do not infer current capability, capacity or ownership from an archived page.
Request an organization and communication map for the order. It should identify technical, quality, production, packing and commercial contacts, along with escalation for nonconformance or delay. Confirm the language and format of drawings, inspection records and shipping documents. Clear interfaces matter when a question must be resolved before a kiln run or dispatch rather than after material reaches site.
Freeze a current product data set
Request a code and drawing showing length, width, actual thickness, any shaped return, edge, surface, rear profile, tolerances and mass. Ask how the archived “(100 + 52) × 200 × 12 mm” notation applies and whether LM562 remains valid. Link the drawing, data sheet, quotation and samples to one revision.
Provide the project application, exposure, loads, wetting, finish, module and programme. Map each requirement to a current document, test or sample. A similar product name cannot substitute for exact identity, and a historical size cannot be carried into an order without confirmation.
Separate quality systems from product evidence
System
Verify the current certificate scope, site, issuer, validity and processes it covers.
Product
Match test method, specimen, code, dimensions, finish and result to project criteria.
Assembly
Coordinate support, bedding, joints, drainage and loads through responsible designers.
Order
Tie approved drawings, samples, lots, inspections and packing records to the purchase release.
A quality-management certificate can support due diligence but does not prove slip, wear, absorption, strength, chemical, freeze–thaw or fire performance. The incomplete archive reference is not usable evidence. Keep a submittal register with reviewer, status and open actions.
Agree production controls and acceptance
Define checks for incoming materials where relevant, forming, drying, firing, dimensions, squareness, warpage, edges, cracks and appearance. Ask the factory to propose sampling and records, then align them with project acceptance. Keep labelled control samples representing the approved fired range.
State how nonconforming units will be identified, segregated, reviewed and replaced. Define who can approve a concession and how it will be recorded. A final inspection cannot recreate missing process traceability, so place hold points before packing where the project risk warrants them.
For a formal audit or remote review, agree the evidence to be available in advance and the production stage to be observed. The review may cover current procedures, calibrated inspection tools, sample identification, lot records and storage of accepted and rejected units. Record findings and close actions with dates; an audit visit is useful only when it produces decisions tied to the specific order.
Test capacity and programme assumptions
Ask for a project-specific schedule covering sample approval, technical submissions, raw-material preparation, production, inspection, packing and dispatch. Identify dependencies and available float without treating an initial lead-time statement as a guarantee. Confirm minimum runs, split deliveries and the consequences of a late design change.
Review quantities, wastage, specials and spares against production lots. Plan pallet sizes and weights, container or vehicle loading, lifting and protected storage. The terracotta floor tile range can frame the enquiry, while the project gallery helps describe intended architectural contexts.
Require lot traceability and change control
Give each production lot a reference that appears on inspection, packing and shipping records. At site, log the lot and installed zone before pallets are mixed. Define the blending plan for fired variation and retain labelled spares. This creates a usable record for later review or replacement.
Route substitutions, process changes, split shipments and replacement batches through the same identity, evidence and sample approval. Record why the change occurred, which documents are affected and who accepted it. Procurement pressure should not turn an exact product into an unreviewed equivalent.
Release and close an audit-ready order
Before release, align supplier scope, product code, drawing, samples, evidence, quality plan, quantity, packing, delivery basis, programme and exclusions. Compare quotations on complete scope rather than unit price. Identify responsibility for mock-ups, testing, inspections, freight and site work.
Handover should include final drawings, production and inspection records, delivery lots, installed locations, approved cleaning method and spare inventory. Preserve revisions and concessions. The completed file should let a future reviewer understand what was ordered, how it was accepted and where each batch was used.