An exterior rainscreen brief should connect exposure conditions to every critical interface.

This checklist organizes wind and rain exposure, wetting and drying, freeze–thaw review, corrosion environment, drainage paths, openings, the wall base, parapets and adjoining materials. It also preserves PG258 images and data published in November 2016 without treating those archived values as current product or system commitments.

01 · Record
Location, elevation zones and exposure conditions
02 · Detail
Openings, base, top, corners and transitions
03 · Coordinate
Drainage, cavity, support and adjacent materials
04 · Verify
Evidence, mock-ups, inspections and responsibilities

Start with an exposure register, not a generic exterior label

Record the building location and use, height and geometry, orientation, local wind and rain conditions, temperature range, freeze–thaw exposure where relevant, coastal or industrial contaminants, solar exposure, ground splash, snow or ice conditions, impact zones and maintenance access. Divide the elevations into zones when corners, parapets, setbacks, entrances or lower levels have different actions or wetting patterns.

The selected terracotta panel is only the outer layer. The support system, cavity, insulation, air-and-water control layers, flashings, fire barriers and backing wall must be coordinated as a complete project assembly. The main Terracotta Rainscreen page covers current product information; the Ventilated Rainscreen Guide explains the wall layers; and the Facade Responsibility Matrix helps assign system decisions.

Evidence boundary: a panel image or archived item number does not establish current availability, allowable size, structural or fixing capacity, wind resistance, freeze–thaw suitability, corrosion resistance, fire classification, drainage performance, weather resistance, thermal or acoustic performance, environmental outcome or code compliance.

Archived PG258 orange and grey speckled terracotta panel reference
The complete 630 × 361 px PG258 image is retained at its original proportion. It is a November 2016 visual reference, not current exposure or facade-performance evidence.

Archived PG258 record from November 2016

The original page published the following fields on 8 November 2016. Units are normalized for readability. Confirm every value through current product data, testing scope, feasibility review and quotation before specification or procurement.

2016 fieldArchived valueCurrent-use boundary
Item / modelPG258Use as an archive reference; confirm active status, body, profile and finish.
SizeCustomizedNo dimensions or limits were stated. Submit the proposed module, geometry, tolerances and edge conditions.
ColourMIXApprove a current physical range, distribution method and batch-control record.
Surface finish3D InkjetConfirm current construction, texture, print scale, repeat and edge treatment.
MaterialNatural ClayA historical description, not environmental or application evidence.
Weight31 kg/m²No configuration, method or tolerance was cited. Obtain a current scoped value for design and logistics.
Water absorptionLess than 0.5%No standard, specimen, laboratory or report was supplied. Require current product-specific evidence.
Thickness18 mmConfirm the current section, tolerances and compatibility with the proposed support interface.
Minimum order1,500 m²A dated commercial entry only. Request a current quotation for the selected scope.
Lead time35 daysA dated estimate only. Current timing follows approvals, production, quantity, packing and destination.
Legacy certification textCE, ISO 9001:2008Not presented as current. Verify holder, scope, site, product, issuer and validity.
Legacy order routeOld order button to `/contact-us/`Use the current Contact page.
Historical boundary: the source gives no test method, report number, specimen, tolerance, size range, system detail or quotation assumptions. PG258 entries cannot be transferred to another item or treated as complete-wall results.

Preserve the six finish references, then select current samples

The original board identifies PG009, PG258, PG252, PG008, PG727 and PG725. It remains complete and readable. These are 2016 archive identifiers, not confirmed current SKUs, and screen colours cannot replace dated physical samples.


Archived granite-look terracotta board labelled PG009, PG258, PG252, PG008, PG727 and PG725
The uncropped 630 × 226 px board keeps all six historical item references and their visible colour directions available.
PG009
PG258
PG252
PG008
PG727
PG725

Approve current samples under relevant light and viewing distance. Record the permitted range, pattern repeat, orientation, blending approach and replacement reference without assuming that the archived image represents present production.

Translate exterior exposure into project checks

Wind and local zones

Define project design actions and local corner, edge, parapet and setback zones. Qualified teams must verify panel, support, anchors, substrate and movement for the actual geometry.

Rain and wetting

Identify prevailing rain, runoff, splashback, ledges and concentrated discharge. Coordinate an accepted water-management strategy rather than relying on the outer panel alone.

Freeze–thaw and temperature

Where relevant, specify current product evidence with the applicable method, specimen and acceptance criteria, and coordinate temperature movement across panels, supports and interfaces.

Corrosion environment

Record coastal salts, industrial contaminants, dissimilar metals, concealed wetting and drainage. Select supports, fasteners, coatings and separation details through project-specific review.

Impact and access

Mark entrances, walkways, service areas, maintenance routes and lower levels. Define impact criteria, inspection access and a safe replacement strategy.

Adjacent materials

Review differential movement, runoff, staining, sealant compatibility, galvanic separation, tolerances and sequencing wherever terracotta meets metal, glass, masonry, concrete or roofing.

Resolve drainage and interface details

Openings
Coordinate heads, jambs and sills; support terminations; flashings; water-control continuity; cavity closures; drainage and replacement access.
Base and grade
Address splash, clearance, drainage discharge, ventilation, impact, paving interfaces, snow or debris and inspection access.
Parapet and top
Coordinate coping, wind zones, cavity termination, membrane continuity, runoff, drips, movement and maintenance.
Corners and returns
Resolve panel orientation, cut edges, joint rhythm, local supports, tolerances and differential movement.
Transitions
Detail interfaces with glazing, roofs, soffits, balconies, canopies, penetrations and other cladding systems.
Movement joints
Carry the project movement strategy through panels, supports, membranes, flashings, cavity barriers and adjoining work.

Drainage openings, flashings and cavity routes must remain coordinated and inspectable. Do not copy a schematic termination as a universal construction detail: dimensions, materials, fasteners, membranes, barriers and sequencing depend on the selected system, substrate, exposure and local requirements.

Minimum exterior exposure and interface brief

  • building location, use, height, geometry, orientation and elevation zones;
  • wind, rain, temperature, freeze–thaw, corrosion and impact criteria;
  • panel schedule, support concept, substrate, cavity and movement strategy;
  • openings, base, parapet, corners, penetrations and adjacent-material details;
  • water-control, drainage, ventilation, insulation and barrier continuity;
  • current product/assembly reports, calculations, mock-ups and inspections;
  • maintenance, cleaning, access, replacement and record requirements; and
  • responsibility matrix for design, approval, manufacture and installation.

Treat the 2016 application list as historical context

The original article marketed the product for exterior walls on new and renovated buildings; metro, railway, tunnel and underground projects; European- or American-style buildings and villa walls or roofs; ceilings; office buildings, commercial podiums and other public projects; interior walls; and surgery rooms, clean rooms, pharmaceutical facilities and food-production workshops.

The list is retained for traceability, not as approval or universal suitability. Each use requires a current review of exposure, substrate, fixing, movement, structural actions, fire strategy, water management, access, hygiene or emissions criteria, cleaning and regulations.


Archived facade image with a circular close view of a printed stone-look surface
The source supplied no project name, location, architect, date, quantity, fixing system or PG258 confirmation. The image remains an unidentified visual reference, not a verified PG258 case study.

Use the related guides for product, layers and responsibility

This page remains the exposure-and-interface checklist. Use the current product page for panel information, the ventilated guide for wall layers, the facade-systems article for responsibility allocation and the installation guide for coordination and troubleshooting boundaries.

Prepare the exterior exposure and interface brief

Send the project location, elevation zones, panel schedule, support concept, interface drawings, required evidence, quantity, programme and delivery destination for review. Final system design, exposure checks, testing, approvals and compliance remain project-specific.