WR884 Grey Split-Face Brick Veneer: Archive Guide clarifies a LOPO page published in 2013. The former title combined environmental, grey, exterior and split-face language with a slim brick veneer family. Those terms can help trace an old design idea, but they are not current declarations. Product identity, colour, texture, exterior suitability, environmental attributes, dimensions, evidence and supply all require new written confirmation.
Read the 2013 WR884 record
The archive identified WR884 and listed a 240 × 60 × 11 mm field brick with two corner formats. It also carried full-body wording, approximately 4% water absorption, generic functions, applications, packing, 20-foot-container capacity, minimum order, sample timing and order lead-time fields. None is an active data sheet or quotation.
| Archive item | WR884 |
|---|---|
| Archived field format | 240 × 60 × 11 mm |
| Archived corner formats | (174 + 50) × 60 × 11 mm or (60 + 60) × 240 × 11 mm |
| Archived appearance | Grey and split face; current samples required |
| Archived material field | Full-body wording; about 4% absorption |

The page’s only original body image remains for recognition. It is not a calibrated grey benchmark, a verified split-face sample or evidence of current production and performance.
Define grey colour and split-face texture
Grey ceramic can lean warm, cool, blue, brown or charcoal. A split-face concept may range from shallow mineral texture to stronger relief, and directional light can amplify its shadows. The former title does not establish undertone, texture depth, sheen, variation, edge character or how the surface was produced.
Request labelled current samples that represent the normal range, not one selected piece. Review them close up and at intended viewing distance beside glass, metal, stone, coatings and joint materials. Record product code, colour, surface, date and sample role. Photography supports communication, while an approved physical set should govern appearance.
Keep environmental language historical
“Environmental” in the old title is not a current sustainability declaration. It does not establish recycled content, responsible sourcing, emissions, embodied impacts, recyclability, service life or compliance with a rating system. Former general statements about natural material or environmental benefit also lack the scope needed for a live project.
Ask for current documents relevant to the exact candidate and destination. Identify their issuer, date, product scope, production source and calculation or test basis. The project team should decide which disclosures or declarations matter to its objectives. Avoid turning a historic adjective into a quantified environmental conclusion.
Use formats and exterior wording cautiously
The slender field format can inform early horizontal or vertical composition studies. The two corner notations may trace former return pieces, but they do not confirm current geometry, tolerance, compatibility, colour matching or availability. “Exterior” does not prove weathering, moisture, freeze-thaw, fire, attachment or whole-wall performance.
Obtain dated drawings for the exact current field and corner products. Qualified professionals must coordinate substrate, movement, interfaces and the building-specific wall proposal with applicable information. This archive provides no generic loads, spans, support spacing, anchors or installation instructions. If a successor differs from WR884, update elevations, quantities and approvals together.
Apply the complete archive boundary
Archive boundary: WR884, full-body material wording, all field and corner dimensions, about 4% absorption, acid, heat, non-slip, wear and firebrick functions, applications, packing, 20-foot-container capacity, MOQ, sample timing and order lead time belong only to 2013.
Old heat or firebrick wording does not establish a present fire conclusion. Request dated evidence that names the exact current product, specimen, method, result, scope and market. Qualified project reviewers should determine which requirements and approvals apply, keeping brick-level evidence separate from evaluation of the complete wall.
Reconfirm current sizes, surfaces, grey range, corners, quantity, packaging, minimum order, sample status, production window, delivery and payment in writing. Keep every sample, drawing, report and quotation linked to the same candidate so information from different products is not combined.
Explore current bricks and references
Review LOPO’s current terracotta brick overview for present colours, textures and formats.
Browse terracotta projects for grey palettes and facade rhythm.
Visit the architectural terracotta gallery to compare brick, tile and panel references.
Use the LOPO contact page for current samples and documentation.
Built references support visual research, but their exact products, assemblies, evidence and approvals are not automatically transferable.
Request a current WR884 review
Share the project location, wall area, elevations, target grey undertone, desired texture and variation, corner conditions, adjacent materials, approximate quantity and programme. Cite WR884 and all archived formats so LOPO can trace the old reference accurately.
Email roger@lopoterracotta.com or use the contact form. Request current product identification, representative samples, dated drawings, applicable environmental and technical evidence, and project-specific commercial information.
Maintain a register covering product code, colour, texture, samples, field and corner drawings, document scope and commercial status. Reconcile the approved physical range with the exact quotation and evidence pack. This turns an archive clue into a traceable enquiry without repeating environmental, exterior or performance wording as a present fact.
Before approval, classify each reviewed piece as an inspiration sample, a representative range or a proposed production benchmark. Record the viewing light, distance, date and adjacent finishes. Check that sample labels match the current field and corner drawings and the documents supplied. If LOPO identifies a successor, replace WR884 in active schedules while retaining it as an archive cross-reference. Track unresolved environmental, exterior-use and availability questions in a dated decision log, and update that log whenever the product, project requirement, document scope or commercial offer changes. Preserve superseded samples and records separately so they cannot overwrite the approved current selection or its verified environmental scope.
