A technical evaluation guide for terracotta panel facades
Terracotta panel facade performance cannot be established from the panel name or a project photograph alone. Product properties, mechanical support, cavity components and the backing wall each answer different questions. This guide turns the broad claims in LOPO’s original 2021 article into a practical framework for requesting project-relevant evidence.
Begin by defining the performance boundary
The legacy page described a hollow clay panel installed with a mechanically supported, or “dry-hung,” arrangement. That is useful context, but it does not identify the panel profile, module, fixing system, substrate, cavity depth or project standard. None of those details should be inferred from the photographs.
A panel test may describe one product property. A fixing calculation may verify a particular support layout. Whole-wall thermal, fire, air, water or acoustic performance requires evidence that represents the relevant assembly. Before comparing values, confirm whether a document applies to the selected panel, its support system or the complete facade build-up.

Thermal and acoustic results belong to the wall assembly
The hollow geometry described in the old article may affect panel mass and the product section, but it is not a substitute for the designed insulation layer and does not by itself establish building energy use. Thermal performance depends on the insulation type and continuity, bracket and anchor bridges, cavity arrangement, backing wall, windows, interfaces and workmanship. Request the project calculation with the actual wall build-up and local design conditions.
Sound performance is similarly assembly-specific. A claim about noise reduction needs an identified test specimen, test method and measured result that can be compared with the proposed wall. Panel cavities alone do not establish airborne-sound insulation for a facade containing joints, windows, vents and other paths.
For a thermal review
Request the complete layer build-up, material conductivities, fastener or bracket effects, interface treatment, calculation method and target required by the project code.
For an acoustic review
Request an assembly test or a qualified assessment that represents the panel, cavity, insulation, backing wall, openings and junctions relevant to the building.
Fire and structural claims require product-specific evidence
Firing clay at high temperature does not, on its own, document the required fire classification for every panel or the fire performance of a ventilated facade. Review the current product classification and supporting report, then coordinate insulation, membranes, cavity barriers, fire stopping, joints and interfaces under the project’s fire strategy and applicable regulations.
Wind, seismic, impact and attachment capacity depend on the selected panel dimensions and orientation, clip engagement, rail and bracket layout, anchor design, substrate, edge conditions, building geometry and design actions. The responsible engineer must verify those variables. The old article’s general references to bolts, metal parts and corrosion resistance are not sufficient for anchor selection or structural approval.

Moisture, cleaning and durability must be separated
In a ventilated rainscreen, the outer panel layer helps manage direct rain while the designed cavity, flashings, drainage openings and backing-wall membranes complete the moisture strategy. Panel water absorption is not the same as whole-wall watertightness, and it does not prove that a surface will remain clean in every exposure.
The 2021 source quoted water absorption of “about 6%” without identifying a product, sample, test method, standard or report. That archived number is not used here as a current specification. Obtain current data for the selected panel and confirm any freeze–thaw or durability requirements for the actual climate.
Cleaning needs depend on texture, colour, orientation, ledges, joints, runoff, pollution and maintenance access. Approve representative samples, study likely water paths and obtain the current cleaning guidance before choosing a method. Do not assume that low water absorption, lack of static charge or rainfall alone provides universal self-cleaning.

Environmental claims need declared scope and data
Natural clay content and a stated manufacturing method do not by themselves prove that a product or building is “green.” A useful environmental review defines the product and manufacturing location, declared unit, life-cycle stages, data period and verification status. It also considers manufacturing energy, yield and waste, packaging, transport, service life, maintenance, replacement and end-of-life scenarios.
Request a current environmental product declaration or other project-accepted documentation where required. Check that the declared product represents the proposed panel and factory. Separate product data from whole-building energy modelling and from project certification credits; they answer different questions.
- selected panel reference, dimensions, profile, finish, colour range and manufacturing location;
- coordinated elevation, sections, support layout, substrate and interface details;
- current test reports or classifications mapped to each specified requirement;
- structural calculations using the project’s actions, geometry, supports and anchors;
- thermal, moisture, fire and acoustic assessments for the relevant complete assembly;
- sample and mock-up approvals, inspection points and replacement criteria; and
- environmental documentation with a clear scope, date and product match.
Use current product information for specification
This article is a performance-evaluation resource, not a substitute for LOPO’s current product range. Review the Terracotta Rainscreen page for current panel context, consult Catalogues and Technical Downloads for available documents, and use the Architectural Terracotta Gallery to discuss visual precedents without treating photographs as specifications.
Request evidence for a terracotta facade
Share the project location, elevations and sections, substrate, target panel module and surface, preliminary quantity, applicable standards and required performance criteria so the relevant current product documents can be identified. Final facade design and compliance remain with the responsible project team.